Finalizing Bridgewater’s drainage redesign for handover

Bridgewater Trails

Bridgewater is in southwest of Winnipeg with east access from Waverley Street, and north access to Kenaston Boulevard at Bishop Grandin Boulevard. Infracor has been tasked with completing the final acceptance and handover process for the landscaped areas of the development. Specifically, detailed review of the project designs and correspondence for the area drainage culverts and redesign of the culverts and drainage paths to reduce erosion so asset handover can be completed.
Bridgewater

Related Projects